Personal tools
You are here: Home Members For NA62 16 07 11 meeting
Document Actions

For NA62 16 07 11 meeting

Photos
8 Steel plates are ready by Vitaliy Semenov — last modified June 27, 2011 at 20:02
Photo
Assambling Sc. Tiles TEST by Vitaliy Semenov — last modified July 3, 2011 at 23:04
Photo of the Side AL plate with two numbers of Tiles
Assambling central Sc-rs TEST by Vitaliy Semenov — last modified June 27, 2011 at 20:24
Central Sc-rs 146.67x146.67x50 . It is seen Cracks (~0.7 mm) betwin 146.67x146.67 and 220x220 TILES, when R=103.00 mm. At R=103.7 Cracks are absent.
Preparations for manufacturing 220x220x50 Tiles by Vitaliy Semenov — last modified June 27, 2011 at 20:57
Initial material Photo (today -27 06 11 - 58 samples)
Drilling holes in Tiles by Vitaliy Semenov — last modified June 27, 2011 at 20:40
The holes in the scintillators are drilling with high presision.
Cosmic Test Bench by Vitaliy Semenov — last modified June 27, 2011 at 20:46
Study <LY> of Scintillator Tiles
Assamb. Cental plate by Vitaliy Semenov — last modified July 3, 2011 at 22:46
First assambl. Test. Cilindre R=103.7 insted R=103.0. The Al plate is turned upwards by "bottom".
Destruction of the scintillator by the fixing screw by Vitaliy Semenov — last modified July 3, 2011 at 22:57
Effect of expression scintillator material by the fixing screw

Powered by Plone, the Open Source Content Management System